Construction Safety Specialists

Construction Risk Mitigation Scanning

Proactive GPR scanning to identify subsurface hazards before your project breaks ground — reducing incidents, delays, and liability across British Columbia.

A division of Anyleak.ca — BC's trusted subsurface specialists since 1999.

WorkSafeBC Compliant
24–48hr Turnaround
Insurance Documentation
Certified Technicians

Risks We Eliminate Before They Happen

A single utility strike or unexpected subsurface hazard can cost tens of thousands in delays, repairs, and legal fees. Pre-construction scanning costs a fraction of that.

Utility Strike Prevention
Critical

Unlocated underground utilities are the leading cause of construction incidents in BC. GPR pre-scanning eliminates this risk.

Hazards Addressed:

  • Gas line strikes — explosion and fire hazard
  • Electrical cable contact — electrocution risk
  • Water main ruptures — flooding and delay
  • Telecom cable damage — service outages and liability
Structural Element Conflicts
High

Hidden rebar, post-tension cables, and conduits create serious conflicts when cutting, drilling, or coring is planned.

Hazards Addressed:

  • Post-tension cable rupture
  • Rebar contact during core drilling
  • Conduit damage during slab cutting
  • Structural compromise from uninformed modifications
Subsurface Voids & Unstable Ground
High

Voids beneath slabs and in subgrade soils can cause unexpected collapses, equipment loss, and worker injuries.

Hazards Addressed:

  • Slab collapse from subsurface voids
  • Equipment loss into unmarked excavations
  • Ground settlement under heavy machinery
  • Foundation failure on unstable subgrade
Regulatory & Insurance Exposure
Moderate

Without documented pre-construction scanning, contractors face WorkSafeBC violations and potential insurance claim rejection.

Hazards Addressed:

  • WorkSafeBC non-compliance fines
  • Insurance claim disputes
  • Project delays from incident investigations
  • Legal liability for third-party damages

What You Receive

Pre-Construction Scan Report

Comprehensive document identifying all subsurface hazards, including annotated site drawings, depth measurements, and risk classifications.

Safe Work Zone Plan

Clearly defined safe work areas and exclusion zones for each hazard type, ready for inclusion in the project safety plan.

WorkSafeBC Compliance Package

Documentation formatted to satisfy WorkSafeBC requirements for pre-excavation utility location and site hazard assessment.

Rapid Turnaround

Reports delivered within 24–48 hours of scanning for time-sensitive project schedules. Emergency response available.

Project Types We Support

New Building Construction
  • Foundation excavation planning
  • Underground service connections
  • Pile driving hazard assessment
  • Basement and parkade construction
Infrastructure & Civil Works
  • Road and highway projects
  • Bridge and overpass work
  • Utility corridor installations
  • Municipal infrastructure upgrades
Renovation & Tenant Improvement
  • Interior demolition planning
  • Slab cutting and coring
  • Mechanical and electrical upgrades
  • Post-tension slab modifications
Industrial Facilities
  • Equipment anchor installation
  • Trenching for process piping
  • Floor grinding and resurfacing
  • Loading dock modifications

WorkSafeBC Requirement

Under BC Regulation Part 20, employers must take all reasonable steps to determine the location of buried utilities before excavation. Our pre-construction scan reports are prepared to satisfy this requirement and are accepted by WorkSafeBC inspectors across BC.

Protect Your Project Before It Starts

Contact our team to schedule a pre-construction scan and receive a WorkSafeBC-compliant hazard report for your site. Serving all of BC.

Call Direct

(604) 239-9934

Email for Quote

info@anyleak.ca
View All GPR Services