GPR Scanning Services for BC Contractors
Every concrete cut that hits a post-tension cable or a buried electrical conduit is a lost day, a safety incident, and a liability exposure. GPRScan.ca is the contractor's first call before any saw-cutting, core drilling, or ground excavation on BC construction sites.
GPR Services Built for Construction Sites
We move at construction speed. Our technicians arrive on-site ready to work, mark hazard locations directly on the concrete surface, and have reports ready for your project file the same day.
Mandatory concrete scanning before any saw-cutting or core drilling. We identify rebar, post-tension cables, electrical conduits, and utility pipes — preventing costly hits and WorkSafeBC incidents.
Ground-penetrating radar utility surveys before ground disturbance. Meets BC One Call requirements and WorkSafeBC pre-excavation safety standards.
On-site GPR technician support during active concrete work. We mark hazard locations directly on the slab surface for your cutting crew.
Scan reports formatted for inclusion in project files, WorkSafeBC compliance records, and general contractor safety plans.
We understand construction schedules. Most requests are fulfilled within 24 hours. Emergency same-day service available for active projects.
We coordinate with structural engineers, electrical contractors, and civil teams to integrate GPR data into project coordination workflows.
Work Types We Support
If it involves cutting, drilling, or digging into or below concrete, GPR scanning is required. We support every phase of construction.
- Concrete core drilling and saw cutting
- Underground parkade renovations
- Post-tension slab modifications
- Foundation and footing excavation
- Road and boulevard excavation
- Mechanical and electrical rough-in
- Structural reinforcement installation
- Building addition and connection work
WorkSafeBC Obligation
Under WorkSafeBC regulations, contractors are obligated to locate all buried services and structural hazards before any ground disturbance or concrete work begins. Failure to scan before cutting post-tension cables is not just costly — it carries significant legal liability and potential fatality risk.
Our GPR scan reports provide the documented evidence of due diligence required by WorkSafeBC for your safety file.
Book a Pre-Scan NowBook a Contractor Scan Today
Most contractor bookings are fulfilled within 24 hours. Emergency same-day dispatch available for active projects across Metro Vancouver and BC.